What are Region II's latest NRC violations/ FPTI inspection results or other relevant O.E.?

Recently in Region II, the NRC has focused on safe shutdown manual operator actions, ignition sources and FPRA 

F

Parents
  • BFN - 

    Catawba - March 2021 - None

    Farley - July 2021 - no violations. Did have a resident violation. 

    Hatch - May 2022 - No violations. 

    Harris - Nov 2021 - 1 minor violation, safe shutdown analysis. Resident Violation. Transient Combustible. Green - NCV. No permit on an item. 

    McGuire - March 2021 - none.

    North Anna - Feb 2021 - none. Fire PRA, not NFPA 805. Timer in CO2 panel. Cam Timers. Discharged 10 secs of CO2 into Diesel Generator room.  Is it possible to put so much CO2 in the room that the diesel wouldn't start?  

    Oconee - Feb 2022 - Safe Shutdown issues. 2 Green. 

    Robinson - Sept 2020 - None

    Sequoyah - NCV - Green. Implementing verification of remote safe shutdown transfer switches. Comments on Ground Fault Equivalent Hot Shorts. 

    St. Lucie - July 2019. None. When Time zero was established for SSD. Recommended annual tests on fire dampers. 

    Surry - Sept 2021. 1 - NCV-Green. Operations SSD Procedure. Time critical action - wrong breaker number. 

    VC Summer - August 2019. No Violations. 

    WBN - Feb 2021. 2 NCV-Green. Latent design error. CCS. FCR for 6 foot clearance for protection. And 2) Dusty Sprinkler head. 

    Vogtle - 1& 2 - June 2021. Hot shorts. 

Reply
  • BFN - 

    Catawba - March 2021 - None

    Farley - July 2021 - no violations. Did have a resident violation. 

    Hatch - May 2022 - No violations. 

    Harris - Nov 2021 - 1 minor violation, safe shutdown analysis. Resident Violation. Transient Combustible. Green - NCV. No permit on an item. 

    McGuire - March 2021 - none.

    North Anna - Feb 2021 - none. Fire PRA, not NFPA 805. Timer in CO2 panel. Cam Timers. Discharged 10 secs of CO2 into Diesel Generator room.  Is it possible to put so much CO2 in the room that the diesel wouldn't start?  

    Oconee - Feb 2022 - Safe Shutdown issues. 2 Green. 

    Robinson - Sept 2020 - None

    Sequoyah - NCV - Green. Implementing verification of remote safe shutdown transfer switches. Comments on Ground Fault Equivalent Hot Shorts. 

    St. Lucie - July 2019. None. When Time zero was established for SSD. Recommended annual tests on fire dampers. 

    Surry - Sept 2021. 1 - NCV-Green. Operations SSD Procedure. Time critical action - wrong breaker number. 

    VC Summer - August 2019. No Violations. 

    WBN - Feb 2021. 2 NCV-Green. Latent design error. CCS. FCR for 6 foot clearance for protection. And 2) Dusty Sprinkler head. 

    Vogtle - 1& 2 - June 2021. Hot shorts. 

Children
No Data